MOQ, Lead Time, and Shipping: B2B Import Checklist for EGR Parts

Published 14 August 2026 · 9 min read · Buyer's Guide

Quick Answer

What should a B2B auto parts import checklist include? A B2B auto parts import checklist should verify supplier IATF 16949 certification, request product samples for testing, confirm OE cross-reference accuracy, negotiate INCOTERMS (FOB or CIF), arrange third-party quality inspection before shipment, and maintain documentation including commercial invoice, packing list, certificate of origin, and bill of lading.

Importing EGR valves from China involves MOQ, lead time, shipping, packaging, and inspection — all affecting total landed cost. This checklist covers every step.

MOQ negotiation

Order typeTypical MOQNotes
Trial order50-100 pcsOften flexible for first order
Standard production200-500 pcsTied to material lot sizes
Custom packaging500-1,000 pcsCustom box printing minimum
Custom part1,000+ pcsTooling + PPAP amortization

Lead time planning

PhaseTime
Material procurement5-10 days
Production10-20 days
Quality inspection3-5 days
Packaging & loading3-5 days
Total (stock)5-10 days
Total (production)20-40 days

Always add +7 days buffer. CNY (Jan/Feb) adds 2-3 weeks. National Day (Oct 1-7) adds 1 week.

Shipping terms

TermMeaningShipping paid by
FOBSeller delivers to portBuyer from port
CIFSeller pays shipping + insurance to portSeller
DDPSeller delivers to buyer's doorSeller
EXWBuyer picks up at factoryBuyer (all)

Recommendation: FOB with your own forwarder for first orders. 20ft container Ningbo to Rotterdam: USD 2,000-5,000, transit 28-35 days.

Packaging requirements

  • Individual box: OE number, TENDA number, qty, weight, "Made in China"
  • Master carton: 10-20 valves, stretch-wrapped on EUR pallet
  • Labels: "Fragile," "This Side Up," "Keep Dry"
  • Desiccant: 2-4 silica gel bags per carton

Quality inspection before shipping

  1. Factory self-inspection (mandatory): 100% leak test + AQL sampling
  2. Third-party pre-shipment (recommended): SGS/BV/TÜV, USD 300-800/day, 5-10% sample
  3. Buyer inspection (large orders): FRI per ISO 2859-1

Key tests: leak rate (≤5 cc/min @ 1.5 bar), flow curve (3-5 samples vs OE), dimensions (Cpk ≥1.33).

Payment terms

MethodTermsRisk
30% deposit + 70% before shipMost commonMedium
30% + 70% against B/L copyStandard sea freightLow-medium
100% L/CLarge orders (>USD 50k)Low
100% T/T advanceTrial onlyHigh

See: manufacturer guide | IATF guide | OEM vs aftermarket

Frequently asked questions

Typical lead time?

Stock: 5-10 days. Production: 20-40 days. Add 7 days buffer.

First order MOQ?

50-100 pcs. Standard: 200-500. Flexible for first orders.

FOB or CIF?

FOB with your forwarder for first orders — more control. CIF convenient but seller's shipping margin 10-20% above market.

How to ensure quality?

Factory inspection report + third-party pre-shipment inspection (SGS/BV/TUV, USD 300-800/day).